


T55
Country | Germany |
Ship Class | 1944-class Motor Torpedo Boat |
Planned Builder | F. Schichau Danzig |
Planned Yard Number | 1723 |
Ordered | 28 Mar 1944 |
Displacement | 1,441 tons standard; 1,823 tons full |
Length | 338 feet |
Beam | 33 feet |
Draft | 12 feet |
Machinery | Four water-tube boilers, two geared steam turbines, two shafts |
Power Output | 52,000 shaft horsepower |
Speed | 37 knots |
Range | 4,500nm at 19 knots |
Crew | 222 |
Armament | 2x2x10.5cm dual purpose guns, 5x2x3.7cm anti-aircraft guns, 2x3x533mm torpedo tubes, 30x mines |
Contributor: C. Peter Chen
This article refers to a planned ship that was not actually built.
ww2dbaseThe order for the construction of torpedo boat T55 was issued to F. Schichau Danzig in 1944, but material delays and then the advancing Soviet troops led to her never having been laid down. In fact, none of her eight sister ships were laid down, either.
ww2dbaseSource: Wikipedia
Last Major Revision: Dec 2023
請考慮透過 Patreon 支持本站。任何數量都會有莫大幫助!感謝您的支持。 請幫助宣傳: 訂閱 WW2DB,掌握最新動態: |
查詢 WW2DB

最新消息
- » The Emperor of Japan Planned to Honor WW2-era Japanese POWs in Mongolia (4 Jul 2025)
- » US State Lawmaker John Winter Caught Using Racial Slur "Jap" and Apologized (11 Jun 2025)
- » Köln/Cologne Evacuated After Discovery of WW2 Bombs (4 Jun 2025)
- » Race, Holocaust, and African-American WW2 Histories Removed from the US Naval Academy Library (7 Apr 2025)
- » US Government Plans to Purge WW2 Information (17 Mar 2025)
- » 所有最新消息
網站統計
- » 1,177 人物傳記
- » 337 事件
- » 45,081 時間軸條目
- » 1,245 軍艦
- » 350 飛機型號
- » 207 車輛型號
- » 376 兵器型號
- » 123 史料文件
- » 261 設施
- » 470 事件
- » 28,492 照片
- » 365 地圖
著名二戰名言
"All right, they're on our left, they're on our right, they're in front of us, they're behind us... they can't get away this time."Lt. Gen. Lewis B. "Chesty" Puller, at Guadalcanal